This is what you should expect from a webhosting company!
QuickCaseSM
Our facility sets the standard in power backups!



Data Center Entrance

The data center is strategically located
with access to dual power grids.

In case of a long-term power failure,
power switches to this diesel generator,
which will automatically take over if the battery
backup system begins losing power.
This generator can run for weeks!

Meanwhile, your website remains up and running!


previous   next



 Or, go back to beginning



©2001
QuickCase LLC

All rights reserved.

So much more to come!